/FDOT opening new ramp to Atlantic Boulevard from Southbound I-95

FDOT opening new ramp to Atlantic Boulevard from Southbound I-95

Jacksonville – The first milestone of the I-95 Overland Bridge replacement project is scheduled for the week of August 10 with the new flyover off-ramp to Atlantic Boulevard from southbound I-95 scheduled to open. The new ramp is located approximately a half mile north of the current ramp (exit 349) and a quarter mile past the exit to San Marco Boulevard (exit 350).

Motorists traveling south across the I-95 Fuller Warren Bridge will use the right lane to exit onto the new Atlantic Boulevard ramp. The two left lanes will continue south on I-95.

Downtown traffic coming from the Acosta and Main Street bridges will continue using the left lane of the I-95 southbound service road to exit onto the new Atlantic Boulevard ramp. The two right lanes will continue to southbound I-95.

Up-to-date lane closure information will be posted on the I-95 Overland Bridge replacement project website at www.I95overlandbridge.com<http://www.I95overlandbridge.com>. A project hotline number has been established to assist the public with questions and concerns: 904-491-2110.

For more information regarding Florida Department of Transportation projects around the Northeast Florida area, please visit http://nflroads.com or contact Ron Tittle at Ron.Tittle@dot.state.fl.us<mailto:Ron.Tittle@dot.state.fl.us>, (904) 360-5457. Follow FDOT on Twitter @MyFDOT_NEFL or http://twitter.com/MyFDOT_NEFL and http://facebook.com/MyFDOTNEFL.

FDOT strives for safe construction zones. Travelers should stay alert, be aware of heavy equipment in the area and follow the 45 mph posted speed limit through the construction zone.

Know Before you Go! Use 511 to find out if your route has any traffic incidents. Dial 511
or go to www.fl511.com<http://www.fl511.com>. Sign up to receive free personalized alerts by phone, text or e-mail.

www.dot.state.fl.us<http://www.dot.state.fl.us>
Consistent, Predictable, Repeatable

image004